CapabilitiesOne shutdown across six capabilities
Industrial capabilities
Platform capabilities
Worked example
One shutdown across six capabilities
A cement planner needs to decide whether to inspect the burner primary-air fan at the next shutdown. The chain below shows how responsibilities fit together. The Ultron inspection request is the demonstrated simulator step. The other handoffs illustrate the intended deployment.
Product documentation · Updated 15 November 2026
#The chain of responsibilities
- RAVEN supplies the approved vibration reading and operating context needed for downstream use. Connectivity →
- POLYCRON resolves which fan and bearing position the tag describes and links the relevant records. Asset context →
- Ultron and ORCAS support the planner’s investigation. The simulated dust case produced a traceable PM-cell request, REQ-013. Machine health →
- GRID and GRAYLOCK can be scoped to assemble work orders, spares and source timestamps for the shutdown review. Industrial AI →
- Autix is designed to track the technician, approvals, materials and shutdown window through completion. Coordination →
- ATMAX can be scoped for a separate performance question after the intervention. An energy comparison needs matched load, production and quality records before a saving can be attributed. Optimisation →